Project StatusPlanning Application submitted in June 2014
Revised Scheme submitted March 2016
Further information submitted September 2017
No of Turbines5
Capacity of Siteup to 15MW
Turbine Height to Blade TipUp To 110m
Site Centre Grid RefNX 17 90

The planning application was submitted to South Ayrshire Council in June 2014 and revised in March 2016 to reduce the number of turbines from 7 to 5 and their height from 125m to 110m. Further envrionmental information was submitted in September 2017. The application is expected to go to committee in mid 2018.

The following documents are available below. Please note that some of the volumes are large files.

Environmental Statemental Second Addendum – September 2017

Environmental Statemental Addendum and Updated Planning Documents – March 2016

Environmental Statement – June 2014

Volume 1a: Non-Technical Summary
Volume 2a: Main Report
Volume 2b: Figures
Volume 3a: Technical Appendices
Volume 4a: Landscape and Visual Wirelines
Volume 4b: Landscape and Visual Montages

Planning Documents – June 2014

Planning Statement
Pre-Application Consultation Report
Pre-Application Consultation Adverts
Design and Access Statement
Planning Application Drawings: A3 Plans, A0 Plans

Other documents available for download:

Further information can be found on the Millenderdale website.